France opens Cadarache facility to test passive reactor safety systems

Two configurable platforms will test heat-removal systems under incident and accident conditions.

Image: World Nuclear News

Key facts

  • EUR9 million in French government funding under France 2030
  • One platform tests hydraulic circuits; the other studies heat transfer in a water-immersed enclosure
  • Experiments are due to begin in 2026, per ASNR

France’s nuclear safety regulator, the Autorité de Sûreté Nucléaire et de Radioprotection (ASNR), has inaugurated research facilities at Cadarache to study passive safety systems. The work is intended to build evidence for independent safety assessments of future small modular reactors (SMRs) and other innovative reactors.

Passive systems are designed to bring a reactor to safe shutdown and maintain that state over a long period without human intervention, with limited reliance on support functions. The project received EUR9 million (USD10 million) in French government funding under France 2030.

The facilities comprise a thermal-hydraulic loop to measure pressure losses in pipes under forced and natural circulation, and a confinement enclosure to study convection and condensation. ASNR says experiments will begin in 2026 and will be open to national and international collaboration.

1 source
Report an error