IAEA team finds damage at ZNPP buildings 200 meters from Units 4 and 5
Limited access to the affected buildings was granted more than 48 hours after the reported October 5 attack.

Key facts
- No casualties or radiation leaks reported after drone strike on laboratory and waste buildings
- Driver bringing supplies to the plant killed in a reported drone attack on 4 October
- No diesel deliveries since March; depleted reserves ahead of winter, per IAEA
- IAEA engaging Ukraine and Russia on localized ceasefire to repair 330 kV switchyard
- 52 drones detected at Chornobyl, 142 air raid alerts across Ukraine sites in a week